Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)
ดาวน์โหลดคอร์สเรียน Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021) ฟรี
ดาวน์โหลด Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)
ข้อมูลไฟล์ (File Info) :
- MP4 Video: h264, 1280×720 Audio: AAC, 44.1 KHz
- Language: English Size: 18.7 GB Duration: 39h 57m
Quantity Surveying,Quantity Takeoff,Steel Estimation,Rate Analysis,B.O.Q,Payments To Contractor,Interim Payment In Excel
สิ่งที่คุณจะได้เรียนรู้ (What you’ll learn) :
-
Estimation Of Complete Project Through Auto-cad And Excel
-
Estimation Of Complete Project Through PDF Files/Hard Copy
-
Beginner Training For Plan Swift
-
Estimation Of Complete Project Through Plan Swift Software
-
Bar bending Schedule Of Foundation,Columns,Beams,Slab,Stairs, In Excel
-
How to Find Material Like Cement,Sand,Coarse Aggregates,Bricks
-
Complete Material Statement In Excel
-
Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel
-
Will Learn How to Create B.O.Q Of Project
-
Mode Of Payments To Contractor
-
Interim Payment In Excel
-
Variations Order In Construction.
-
How to Create Variations Order In Excel (Important For Quantity Surveyors)
-
Microsoft Excel For Beginners
-
Primavera P6 Training For Beginners
-
Auto-cad 2020 For Beginners
-
MS Project Training For Beginners
-
Activities And W.B.S List In MS Excel
-
Adding Manpower In Excel (Labor, Mason, Carpenter etc.)
-
Finding The Duration Of Activities Based On Productivity
-
Complete Project In Primavera p6 (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
-
Complete Project In MS PROJECT (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
-
Practice Question After Ending Of Each Module
ข้อกำหนด (Requirements) :
-
• To have the Auto Cad And M.S Excel installed in your computer.
-
• To have the minimum understanding for Civil Quantity/Estimation
-
• To have a minimum understanding of construction processes.
คำอธิบาย (Description) :
Complete Updated Course Last Update 03/2023
Complete Package.
-
Complete Project Estimation Through AutoCAD And Excel.
-
Complete Project Estimation (Manual Calculations PDF Drawings Same Project.)
-
Complete Project Estimation (Through Plan Swift Software Same Project)
-
Primavera P6 Training For Beginners.
-
We, Will, Create Complete Project In Primavera P6 (The same Project For Which We did the Estimation)
-
MS Project 2019 Training For Beginners
-
We, Will, Create Complete Project In MS PROJECT (The same Project For Which We did the Estimation)
-
Excel Training For Beginners.
-
Autocad Training For Beginners.
-
Interim Payment Certificate (Payment process in construction)
-
Variation Orders In Construction Projects
-
Practice Questions After the Ending Of Each Module
In Practice Questions,
I have designed a mini Project for you if you did all of the practice questions Step By Step then after ending of this Course You will be able to Do complete project Estimation. And Also Able to do the Planning Of the Same Project In Primavera P6 And Microsoft Project.
Welcome to Quantity Surveying /Building Estimation online training course. it is focused on practical application of Estimation using Auto Cad & M.S Excel
This course is a field-oriented course and contains real examples and a full fledge real project for better understanding
After successful completion of this course, you will be able to Estimate Any Building Project (From Foundation To Finishing)
Major Topics That We Will Learn In This Course:
Quantity Of Substructure (Isolated Footing) Through AutoCAD
-
Excavation Quantity
-
Formwork Calculations
-
Concrete Quantity
Quantity Of Sloped Footing Through AutoCAD
-
Excavation Quantity
-
Formwork Calculations
-
Concrete Quantity
Quantity Of Different Items In Superstructure Through AutoCAD
-
Column In S.S (Formwork, Concrete)
-
Grade Beams (Formwork,Concrete )
-
Slab On Grade (Formwork, Concrete)
-
Lintel And Top Beam (Formwork, Concrete)
-
Slab (Concrete And Formwork)
-
Brick Works
-
Plaster Works
-
Tile And Marble Works
-
Paint Works
Quantity Of Substructure (Isolated Footing) Manual Calculations PDF File Or Hard Copy Of Drawings
-
Excavation Quantity
-
Formwork Calculations
-
Concrete Quantity
Quantity Of Different Items In Superstructure Through PDF File, Manual Calculations
-
Column In S.S (Formwork , Concrete)
-
Grade Beams (Formwork , Concrete )
-
Slab On Grade (Formwork, Concrete)
-
Lintel And Top Beam (Formwork, Concrete)
-
Slab (Concrete And Formwork)
-
Brick Works
-
Plaster Works
-
Tile And Marble Works
-
Paint Works
Quantity Of Substructure (Through Planswift)
-
Excavation Quantity
-
Formwork Calculations
-
Concrete Quantity
Quantity Of Different Items In Superstructure (Through Planswift)
-
Column In S.S (Formwork, Concrete)
-
Grade Beams (Formwork, Concrete )
-
Slab On Grade (Formwork, Concrete)
-
Lintel And Top Beam (Formwork, Concrete)
-
Slab (Concrete And Formwork)
-
Brick Works
-
Plaster Works
-
Tile And Marble Works
-
Paint Works
Bar bending Schedule:
-
Bar-bending Schedule Of Isolated Footing
-
Bar-bending Schedule Of Column Necks And Columns
-
Bar-bending Schedule Of Beams
-
Bar-bending Schedule Of Stairs
-
Bar Bending Schedule Of Slab
-
Bar-Bending Schedule Of Two-Way Slab
Rate Analysis Of Different Works:
-
Rate Analysis For Excavation
-
Rate Analysis For Plain Cement Concrete (P.C.C)
-
Rate Analysis For Reinforcement Concrete (Column Beam And Slab)
-
Rate Analysis For Masonry Work
-
Rate Analysis For Plaster Work
-
Rate Analysis For Tile Work
-
Rate Analysis For Paint Work
Material Statement :
-
Material Statement In Excel
Bill Of Quantity (B.O.Q)
-
Bill Of Quantity For A Project According To CSI Codes
Mode Of Payments To Contractor
-
Interim Payment
-
Advance Payment
-
Secured Advance
-
Petty Advance
-
Mobilization Advance
-
Procedure To Create Interim Payment In Excel From Scratch.
Variation Orders In Construction:
-
· Introduction To Variation Orders In Construction.
-
· How to Create Variation Orders In Excel.
Primavera P6 Training For Beginners
-
As We are Doing Same Project In Primavera So This Training Is For Those Who Are Beginners In Planning OR In Primavera.
Complete Project In Primavera P6 With The Help Of MS Excel.
-
Creating Activity List In Ms Excel.
-
Add Manpower And Their Productivity In MS Excel
-
Adding Duration To Activities Based On Productivity
-
Creating Project In Primavera P6
-
Importing All Of Activities From Excel To P6
-
W.B.S And Relationship For Activities
-
Creating And Assigning Resources To Activities (Work And Material Resources)
-
Update The Project According To Actual (Time And Cost)
MS PROJECT Training For Beginners
-
As We are Doing Same Project In MS Project So This Training Is For Those Who Are Beginners In Planning OR In MS Project.
Complete Project In MS Project With The Help Of MS Excel.
-
Creating Activity List In Ms Excel.
-
Add Manpower And Their Productivity In MS Excel
-
Adding Duration To Activities Based On Productivity
-
Creating Project In MS Project
-
Importing All Of Activities From Excel To MS Project
-
W.B.S And Relationship For Activities
-
Creating And Assigning Resources To Activities (Work And Material Resources)
-
Update The Project According To Actual (Time And Cost)
Excel Training For Beginners
-
As Excel Is Important For This Course So I Have Add Basic Training And Formulas For Those Who Are Beginners In Excel
Auto-cad Training
-
As Auto-cad Is Also Essential For This Course So I Have Also Included Auto-cad Training For Those Who Are Beginner In Auto-cad
Practice Questions After the Ending Of Each Module.
-
In Practice You will do a complete mini-project (Estimation, Project Planning)
คอร์สนี้เหมาะกับใคร (Who this course is for) :
- • Site Engineers
- • Civil Engineers
- • Fresh Engineers.
- • Quantity Surveyors
- • Those who wants to pursue a career as a Quantity Surveyor/ Estimator
- • Civil Engineering Students
เนื้อหาหลักสูตร (Overview) :
Introduction
6 lectures • 25min
Foundation Work (Isolated Footing) Estimation With AutoCad
9 lectures • 47min
Column Necks (Estimation With AutoCad)
3 lectures • 13min
Backfilling (Estimation With Cad)
2 lectures • 9min
Grade Beam (Estimation With AutoCad)
8 lectures • 1hr 9min
Slab On Grade (Estimation With AutoCad)
3 lectures • 28min
Column In Superstructure (Estimation With AutoCad)
3 lectures • 15min
Formwork And Concrete For Lintels (Estimation With Cad)
4 lectures • 28min
Stairs (Estimation With AutoCad)
2 lectures • 23min
Top Beam (Estimation Through Cad)
3 lectures • 23min
Slab (Estimation With AutoCad)
4 lectures • 42min
Brick Work In Superstructure (Estimation With AutoCad)
4 lectures • 48min
Brick Works In Parapet Wall And Mumty (Estimation With AutoCad)
3 lectures • 19min
Plaster Work (Estimation With AutoCad)
7 lectures • 58min
Tiles And Marble (Estimation With AutoCad)
7 lectures • 42min
Paint Work (Estimation With AutoCad)
2 lectures • 13min
Bar bending Schedule Basic
11 lectures • 1hr 7min
Bar Bending Schedule Excel Sheet (Meter And Millimeters)
2 lectures • 16min
Bar Bending Schedule For Footing
2 lectures • 23min
Bar Bending Schedule For Columns
4 lectures • 48min
Bar Bending Schedule For Grade Beams
5 lectures • 57min
Bar Bending Schedule For Top Beams
1 lecture • 10min
Bar Bending Schedule For Stairs.
2 lectures • 17min
Bar Bending Schedule For Slab
4 lectures • 27min
Foundation Work (Estimation Through PDF File/Hard Copy)
3 lectures • 14min
Backfilling And Column Necks (PDF/Hard Copy)
2 lectures • 7min
Grade Beam (Estimation Through PDF File/Hard Copy)
5 lectures • 41min
Slab On Grade (Estimation Through PDF File/Hard Copy)
3 lectures • 22min
Column In Superstructure (Estimation Through PDF File/Hard Copy)
2 lectures • 5min
Stair Formwork And Concrete (Estimation Through PDF File/Hard Copy)
3 lectures • 29min
Formwork And Concrete For Slab (Estimation Through PDF File/Hard Copy)
2 lectures • 11min
Brickwork In Superstructure (Estimation Through PDF File/Hard Copy)
4 lectures • 22min
Plaster Work (Estimation Through PDF File/Hard Copy)
4 lectures • 30min
Tiles And Marble (Estimation Through PDF File/Hard Copy)
2 lectures • 8min
PLANSWIFT BEGINNERS TRAINING (If You Know Basic Tools Of Plan Swift you can skip
7 lectures • 57min
Foundation Works (Estimation Through Plan swift) PDF OR SCAN FILE
5 lectures • 36min
Column Necks (Calculations Through Plan Swift No 1 Take off Software)
3 lectures • 10min
Grade Beam (Calculations Through Plan Swift No 1 Take off Software)
3 lectures • 29min
Slab On Grade (Calculations Through Plan Swift No 1 Take off Software)
2 lectures • 5min
Column In Super Structure(Calculations Through Plan Swift No 1 Take off Software
2 lectures • 12min
Stairs (Calculations Through Plan Swift No 1 Take off Software)
2 lectures • 22min
Slab (Calculations Through Plan Swift No 1 Take off Software)
3 lectures • 19min
Brick Work (Calculations Through Plan Swift No 1 Take off Software)
3 lectures • 29min
Plaster Works (Calculations Through Plan Swift No 1 Take off Software)
2 lectures • 8min
Tiles And Marble Works(Calculations Through Plan Swift No 1 Take off Software)
3 lectures • 10min
Rate Analysis Manual Calculations
7 lectures • 32min
Material Statement Excel Sheet (Imp For Project Planning In Material Resources)
1 lecture • 11min
Bill Of Quantity (B.O.Q)
2 lectures • 11min
Primavera p6 Training (Important if you are beginner in primavera and planning)
14 lectures • 2hr 1min
Project Planning (Activity WBS List In Excel In Detail)
5 lectures • 37min
Defining Resources And Their Productivity In Excel Sheet
4 lectures • 22min
Budgeted Unit And Duration To Activities.
5 lectures • 27min
Creating Complete Project In Primavera p6
5 lectures • 30min
Relationships
3 lectures • 15min
How to Create And Assign Resources In Primavera For Our Project
11 lectures • 1hr 8min
How to Update The Project According To Actual.
3 lectures • 15min
Ms Project Training For Beginners (Very Important If You Are Begin In MS PROJECT
13 lectures • 2hr 4min
Important Setting And Importing Activities In Ms. Project.
3 lectures • 11min
Defining W.B.S For Our Project In MS Project.
2 lectures • 8min
Relationships To Activities
2 lectures • 6min
Creating And Assigning Resources In MS PROJECT
5 lectures • 38min
How to Update The Project In MS Project.
3 lectures • 12min
Mode Of Payments To Contractor
8 lectures • 1hr 1min
Variations Orders In Constructions (Very Important For Quantity Surveyors.
5 lectures • 41min
Excel Training For Beginners
5 lectures • 26min
Formulas In Excel
4 lectures • 24min
Auto-cad Training For Beginners (Introduction)
9 lectures • 35min
Commands
8 lectures • 57min
Modifying Object
15 lectures • 1hr 9min
Dimensions
10 lectures • 50min
(Bonus) Lectures Foundation Work ( Sloped Footing)
3 lectures • 19min
(Bonus) Bar Bending Schedule Excel Sheet (Feet And Inches)
2 lectures • 24min
Bonus (B.B.S For Two Way Slab (Slab With Crank Bars))
5 lectures • 53min
(Bonus) Bar Bending Schedule For Septic Tank.
6 lectures • 1hr 11min
Final Note And Resources
1 lecture • 1min
Certificate Of Completion
1 lecture • 7min
ตัวอย่างหลักสูตร
(Course Preview)

Requirements • To have the Auto Cad And M.S Excel installed in your computer.
• To have the minimum understanding for Civil Quantity/Estimation
• To have a minimum understanding of construction processes.
ข้อมูลไฟล์ (File Info)
License : FOR EDUCATIONAL PURPOSES ONLY
ชื่อไฟล์ : Quantity Surveying Building Estimation With Cad And Excel.rar
ขนาดไฟล์ : 19.7 GB
นามสกุลไฟล์ : *.rar
Server : Google Drive
วันที่อัพโหลด : 26/03/2023
แก้ไขล่าสุด : 09/10/2024 แก้ไขลิ้งค์แล้ว
รหัสผ่าน : sbz
โปรดระวังโฆษณาเด้งไปหน้าอื่น เช็คชื่อไฟล์, ขนาดไฟล์ ก่อนดาวน์โหลดทุกครั้ง
ดาวน์โหลด
รหัสแตกไฟล์คือ sbz
วิธีดาวน์โหลด วิธีแก้ลิ้งค์เกินโควต้า